Home  •   Field Guide  •   Forums  •    Unread Posts  •   Maps  •   Find a Hike!
| Special page | Print Friendly and PDF

Search results

From Oregon Hikers Field Guide

  • <b>From Estacada:</b> From the east end of Estacada, at the junction with Highway 211S for Molalla, keep straight (left) on Hig
    2 KB (307 words) - 15:42, 8 July 2023
  • ...oregonhikers.org/forum/viewtopic.php?f=8&t=22924 The Molalla Highway from Estacada 11-14-15]
    5 KB (789 words) - 14:15, 14 June 2021
  • {{GuideSub|Estacada Area}} ... Hike|6.1|480|Loop hike up a bluff above the Clackamas and then down along Estacada Lake}}
    28 KB (3,973 words) - 16:02, 23 March 2024
  • To reach the trailhead from Portland, follow Highway 224 to Estacada; then continue 6.6 miles from the junction with Highway 211 to turn left Ro
    3 KB (417 words) - 14:38, 4 August 2023
  • From Estacada, head southeast on Hwy. 224 (which turns into FR 46) for about 53 miles unt
    4 KB (686 words) - 21:05, 20 February 2022
  • ...ortland, drive southeast on Highway 224 to Ripplebrook, some 25 miles from Estacada.
    2 KB (326 words) - 19:26, 29 October 2021
  • ...outheast from Portland on State Hwy 224 to Ripplebrook, some 25 miles from Estacada. From Ripplebrook continue straight on 224, which turns into paved FR46, pa
    5 KB (722 words) - 19:32, 29 October 2021
  • From I-205, take Exit 12A for Highways 212 and 224E, Clackamas and Estacada. ...r exiting, drive 3.2 miles and make a right on Highway 224E for Carver and Estacada.
    2 KB (280 words) - 15:38, 7 July 2023
  • Driving on I-205, take Exit 13 for Highways 224 and 213, Milwaukie and Estacada. Turn onto Highway 224 for Estacada, drive about 2 miles to the junction with Highway 212, where you need to tu
    2 KB (380 words) - 19:29, 11 September 2022
  • ...iles to a junction, where you peel off to the right on 224E for Carver and Estacada. Drive another 15.2 miles into Estacada and, at the junction where 211S goes off to the right for Molalla, keep str
    3 KB (422 words) - 19:42, 11 September 2022
  • From Interstate 205, take exit 12 and follow the signs to Estacada, about 18 miles. From the east end of Estacada, at the junction with Highway 211, keep straight on Highway 224 for North F
    1 KB (171 words) - 19:58, 11 September 2022
  • Take Exit 12A from I-205 South for Highway 224E and 212E and Clackamas and Estacada. After exiting, keep right and drive 3.3 miles to make a right for Carver and Estacada on Highway 224E.
    2 KB (252 words) - 22:57, 29 December 2020
  • <b>Via Estacada:</b> ...Highway 224, drive 3.3 miles and turn right on Highway 224E for Carver and Estacada.
    2 KB (358 words) - 19:54, 11 September 2022
  • ...spot.com/2012/02/eagle-fern-park-estacada-oregon.html Eagle Fern Park – Estacada, Oregon (Black Watch Sasquatch)] ...0-news/422349-327041-caretaker-of-the-parks “Caretaker of the parks” (Estacada News)]
    8 KB (1,260 words) - 17:13, 11 October 2023
  • Drive Highway 212/224 east, and bear right for Carver and Estacada where Highway 212 splits off for Damascus.
    2 KB (231 words) - 21:56, 24 January 2020
  • ...Highway 224, drive 3.3 miles and turn right on Highway 224E for Carver and Estacada. Go 15.3 miles, passing through Carver and Estacada. On the east side of Estacada, at the junction with Highway 211 for Molalla and Woodburn, keep straight o
    3 KB (428 words) - 22:10, 5 July 2020
  • ...yestacada.com/clackamas-river-trail-715/ Clackamas River Trail #715 (Play Estacada)]
    11 KB (1,618 words) - 03:30, 22 October 2023
  • From I-205, take Exit 12A for Highways 212 and 224E, Clackamas and Estacada. ...r exiting, drive 3.2 miles and make a right on Highway 224E for Carver and Estacada.
    2 KB (294 words) - 18:55, 11 September 2022
  • From I-205, take Exit 12A for Highways 212 and 224E, Clackamas and Estacada. ...r exiting, drive 3.2 miles and make a right on Highway 224E for Carver and Estacada.
    1 KB (208 words) - 19:01, 11 September 2022
  • ...//www.oregonhikers.org/forum/viewtopic.php?f=8&t=30302 Eagle Creek Trail (Estacada) #501 - May 13, 2022]
    10 KB (1,493 words) - 16:52, 25 October 2022
  • Take 224 past Estacada and continue straight on FR 46 at the Ripplebrook Ranger Station. Follow 46
    2 KB (341 words) - 21:06, 20 February 2022
  • To reach the trailhead from Portland, follow Highway 224 to Estacada; then continue 6.6 miles from the junction with Highway 211 to turn left Ro
    2 KB (282 words) - 15:04, 4 August 2023
  • ...cade Highway (Highway 213). Keep straight at this junction for Molalla and Estacada. ...e four-way junction in the center of Molalla and keep straight for Colton, Estacada, and Sandy.
    3 KB (445 words) - 16:49, 24 April 2020
  • ...cade Highway (Highway 213). Keep straight at this junction for Molalla and Estacada. ...e four-way junction in the center of Molalla and keep straight for Colton, Estacada, and Sandy.
    3 KB (491 words) - 18:04, 26 January 2018
  • ...cade Highway (Highway 213). Keep straight at this junction for Molalla and Estacada. ...e four-way junction in the center of Molalla and keep straight for Colton, Estacada, and Sandy.
    2 KB (350 words) - 03:43, 26 June 2023
  • ...cade Highway (Highway 213). Keep straight at this junction for Molalla and Estacada. ...e four-way junction in the center of Molalla and keep straight for Colton, Estacada, and Sandy.
    2 KB (315 words) - 17:58, 26 January 2018
  • ...cade Highway (Highway 213). Keep straight at this junction for Molalla and Estacada. ...e four-way junction in the center of Molalla and keep straight for Colton, Estacada, and Sandy.
    2 KB (351 words) - 03:47, 26 June 2023
  • <b>Via Estacada:</b> Take Exit 12A on I-205 South for Clackamas and Estacada, Highway 212E and 224E.
    3 KB (500 words) - 20:03, 11 September 2022
  • Take Exit 12A on I-205 South for Clackamas and Estacada, Highway 212E and 224E. Drive 3.3 miles and bear right for Carver and Estacada on 224E.
    2 KB (314 words) - 22:08, 29 September 2023
  • <b>Via Estacada:</b> Take Exit 12A on I-205 South for Clackamas and Estacada, Highway 212E and 224E.
    3 KB (427 words) - 20:01, 11 September 2022
  • <b>Via Estacada:</b> Take Exit 12A on I-205 South for Clackamas and Estacada, Highway 212E and 224E.
    3 KB (457 words) - 20:49, 6 April 2020
  • Driving I-205, take Exit 12A for Highways 224 and 212, Clackamas and Estacada. ...raffic light, drive 3.3 miles and bear right for Highway 224E, Carver, and Estacada.
    2 KB (322 words) - 22:37, 28 August 2021
  • Driving on I-205, take Exit 13 for Highways 224 and 213, Milwaukie and Estacada. Turn onto Highway 224 for Estacada, drive about 2 miles to the junction with Highway 212, where you need to tu
    3 KB (400 words) - 19:24, 11 September 2022
  • Driving I-205, take Exit 12A for Highways 224 and 212, Clackamas and Estacada. ...raffic light, drive 3.3 miles and bear right for Highway 224E, Carver, and Estacada.
    2 KB (322 words) - 19:13, 11 September 2022
  • ...xplaining its role on the electric rail line which once ran all the way to Estacada. Pass under the Highland Drive road bridge. Sixty yards after crossing a br
    5 KB (850 words) - 01:41, 20 April 2020
  • Driving I-205, take Exit 12 for Highway 224 and 212E, Clackamas and Estacada. Head east after exiting. ...erpass, it’s 3.3 miles to a junction where you bear right for Carver and Estacada on Highway 224E.
    3 KB (423 words) - 16:48, 25 October 2022
  • ...cade Highway (Highway 213). Keep straight at this junction for Molalla and Estacada. ...e four-way junction in the center of Molalla and keep straight for Colton, Estacada, and Sandy.
    2 KB (296 words) - 17:57, 26 January 2018
  • ...ing south on I-205, take Exit 12A for Highways 224 and 212E, Clackamas and Estacada. ...Highway 224, drive 3.3 miles and turn right on Highway 224E for Carver and Estacada.
    1 KB (187 words) - 18:50, 11 September 2022
  • ...ing south on I-205, take Exit 12A for Highways 224 and 212E, Clackamas and Estacada. ...Highway 224, drive 3.3 miles and turn right on Highway 224E for Carver and Estacada.
    2 KB (297 words) - 19:56, 21 July 2020
  • ...ing south on I-205, take Exit 12A for Highways 224 and 212E, Clackamas and Estacada. ...Highway 224, drive 3.3 miles and turn right on Highway 224E for Carver and Estacada.
    2 KB (306 words) - 19:57, 21 July 2020
  • Take Exit 12A on I-205 South for Clackamas and Estacada, Highway 212E and 224E. Drive 3.3 miles and bear right for Carver and Estacada on 224E.
    2 KB (272 words) - 04:05, 18 October 2022
  • Take Exit 12A on I-205 South for Clackamas and Estacada, Highway 212E and 224E. Drive 3.3 miles and bear right for Carver and Estacada on 224E.
    2 KB (253 words) - 23:37, 19 February 2020
  • Take Exit 12A on I-205 South for Clackamas and Estacada, Highway 212E and 224E. Drive 3.3 miles and bear right for Carver and Estacada on 224E.
    2 KB (269 words) - 22:17, 5 July 2020
  • ...Highway 224, drive 3.3 miles and turn right on Highway 224E for Carver and Estacada. Go 15.3 miles, passing through Carver and Estacada. On the east side of Estacada, at the junction with Highway 211 for Molalla and Woodburn, keep straight o
    2 KB (260 words) - 18:59, 16 August 2020
  • ...Highway 224, drive 3.3 miles and turn right on Highway 224E for Carver and Estacada. Go 15.3 miles, passing through Carver and Estacada. On the east side of Estacada, at the junction with Highway 211 for Molalla and Woodburn, keep straight o
    2 KB (280 words) - 23:15, 29 February 2020
  • ...Highway 224, drive 3.3 miles and turn right on Highway 224E for Carver and Estacada. Go 15.3 miles, passing through Carver and Estacada. On the east side of Estacada, at the junction with Highway 211 for Molalla and Woodburn, keep straight o
    2 KB (299 words) - 03:05, 30 August 2023
  • <b>Through Estacada:</b> From the east end of Estacada, at the junction with 211S for Molalla, continue straight on Highway 224E f
    2 KB (318 words) - 18:14, 10 December 2021
  • <b>Through Estacada:</b> From the east end of Estacada, at the junction with 211S for Molalla, continue straight on Highway 224E f
    2 KB (339 words) - 18:14, 10 December 2021
  • <b>Through Estacada:</b> From the east end of Estacada, at the junction with 211S for Molalla, continue straight on Highway 224E f
    2 KB (363 words) - 18:13, 10 December 2021
  • <b>Via Estacada:</b> From the east end of Estacada, at the junction with 211S for Molalla, continue straight on Highway 224E f
    2 KB (381 words) - 15:57, 4 September 2023
  • ...nneman Station]] as far as the Cazadero Dam on the Clackamas, just east of Estacada (The dam was completed in 1907). Later the line was extended a little furth
    7 KB (1,081 words) - 17:18, 22 September 2023
  • Take Exit 12A from I-205 South for Highway 224E and 212E and Clackamas and Estacada. After exiting, keep right and drive 3.3 miles to make a right for Carver and Estacada on Highway 224E.
    2 KB (293 words) - 07:54, 20 June 2020
  • Take Exit 12A from I-205 South for Highway 224E and 212E and Clackamas and Estacada. After exiting, keep right and drive 3.3 miles to make a right for Carver and Estacada on Highway 224E.
    2 KB (221 words) - 22:20, 5 July 2020
  • Take Exit 12A from I-205 South for Highway 224E and 212E and Clackamas and Estacada. After exiting, keep right and drive 3.3 miles to make a right for Carver and Estacada on Highway 224E.
    2 KB (218 words) - 22:20, 5 July 2020
  • Take Exit 12A from I-205 South for Highway 224E and 212E and Clackamas and Estacada. After exiting, keep right and drive 3.3 miles to make a right for Carver and Estacada on Highway 224E.
    1 KB (211 words) - 17:36, 1 March 2020
  • ...Road now runs, before dropping down to the vicinity of the current city of Estacada. The Forest Service improved upon this connection until logging roads and c
    5 KB (770 words) - 19:32, 12 December 2019
  • ...Highway 224, drive 3.3 miles and turn right on Highway 224E for Carver and Estacada. Go 15.3 miles, passing through Carver and Estacada. On the east side of Estacada, at the junction with Highway 211 for Molalla and Woodburn, keep straight o
    2 KB (257 words) - 19:54, 21 July 2020
  • ...ing south on I-205, take Exit 12A for Highways 224 and 212E, Clackamas and Estacada. ...Highway 224, drive 3.3 miles and turn right on Highway 224E for Carver and Estacada.
    1 KB (194 words) - 22:10, 29 September 2023
  • ...ing south on I-205, take Exit 12A for Highways 224 and 212E, Clackamas and Estacada. ...Highway 224, drive 3.3 miles and turn right on Highway 224E for Carver and Estacada.
    1 KB (199 words) - 22:10, 29 September 2023
  • ...ing south on I-205, take Exit 12A for Highways 224 and 212E, Clackamas and Estacada. ...Highway 224, drive 3.3 miles and turn right on Highway 224E for Carver and Estacada.
    2 KB (237 words) - 22:09, 29 September 2023
  • ...Highway 224, drive 3.3 miles and turn right on Highway 224E for Carver and Estacada. Go 15.3 miles, passing through Carver and Estacada. On the east side of Estacada, at the junction with Highway 211 for Molalla and Woodburn, keep straight o
    2 KB (270 words) - 22:15, 5 July 2020
  • ...ers.org/forum/viewtopic.php?f=8&t=5565 Fish Creek Mountain and High Lake, Estacada area,OR]
    7 KB (1,066 words) - 15:36, 2 November 2023
  • ...ing south on I-205, take Exit 12A for Highways 224 and 212E, Clackamas and Estacada. ...Highway 224, drive 3.3 miles and turn right on Highway 224E for Carver and Estacada.
    2 KB (241 words) - 15:41, 12 October 2020
  • ...cade Highway (Highway 213). Keep straight at this junction for Molalla and Estacada. ...e four-way junction in the center of Molalla and keep straight for Colton, Estacada, and Sandy.
    3 KB (480 words) - 18:06, 26 January 2018
  • ...cade Highway (Highway 213). Keep straight at this junction for Molalla and Estacada. ...e four-way junction in the center of Molalla and keep straight for Colton, Estacada, and Sandy.
    2 KB (385 words) - 18:05, 26 January 2018
  • <b>Via Estacada:</b> ...Highway 224, drive 3.3 miles and turn right on Highway 224E for Carver and Estacada.
    3 KB (393 words) - 19:28, 2 January 2022
  • <b>Via Estacada:</b> ...Highway 224, drive 3.3 miles and turn right on Highway 224E for Carver and Estacada.
    2 KB (379 words) - 19:53, 11 September 2022
  • From I-205, take Exit 12A for Highways 212 and 224E, Clackamas and Estacada. ...r exiting, drive 3.2 miles and make a right on Highway 224E for Carver and Estacada.
    1 KB (194 words) - 15:29, 12 October 2020
  • From I-205, take Exit 12A for Highways 212 and 224E, Clackamas and Estacada. ...r exiting, drive 3.2 miles and make a right on Highway 224E for Carver and Estacada.
    1 KB (162 words) - 19:01, 11 September 2022
  • Take Exit 12A on I-205 South for Clackamas and Estacada, Highway 212E and 224E. Drive 3.3 miles and bear right for Carver and Estacada on 224E.
    2 KB (301 words) - 02:45, 10 October 2023
  • Take Exit 12A on I-205 South for Clackamas and Estacada, Highway 212E and 224E. Drive 3.3 miles and bear right for Carver and Estacada on 224E.
    2 KB (241 words) - 20:02, 11 September 2022
  • ...Highway 224, drive 3.3 miles and turn right on Highway 224E for Carver and Estacada. Go 15.3 miles, passing through Carver and Estacada. On the east side of Estacada, at the junction with Highway 211 for Molalla and Woodburn, keep straight o
    2 KB (285 words) - 19:27, 2 January 2022
  • ...Highway 224, drive 3.3 miles and turn right on Highway 224E for Carver and Estacada. Go 15.3 miles, passing through Carver and Estacada. On the east side of Estacada, at the junction with Highway 211 for Molalla and Woodburn, keep straight o
    2 KB (286 words) - 19:57, 11 September 2022
  • |From Estacada, Oregon: take Highway 224 East (Clackamas Highway), sign for North Fork Lak
    2 KB (244 words) - 19:31, 28 May 2019
  • ...yestacada.com/clackamas-river-trail-715/ Clackamas River Trail #715 (Play Estacada)]
    8 KB (1,163 words) - 03:31, 22 October 2023
  • Drive I-205 south and take Exit 13 for Milwaukie and Estacada. Proceed 1.6 miles, and turn right onto Highway 224 for Carver and Estacada.
    2 KB (256 words) - 02:12, 24 September 2023
  • <b>From Estacada:</b> At the east end of Estacada, from the junction with Highway 211S for Molalla, keep straight (left) on H
    2 KB (242 words) - 15:40, 23 March 2024
  • <b>From Estacada:</b> At the east end of Estacada, from the junction with Highway 211S for Molalla, keep straight (left) on H
    1 KB (205 words) - 16:06, 5 March 2020
  • <b>From Estacada:</b> At the east end of Estacada, from the junction with Highway 211S for Molalla, keep straight (left) on H
    2 KB (234 words) - 15:50, 23 August 2017
  • ...g a couple of wide, sweeping bends in the Clackamas River near the town of Estacada. This is a full-service park, with campgrounds, boat launches, a disk golf
    10 KB (1,592 words) - 23:29, 25 September 2023
  • Drive I-205 south and take Exit 13 for Milwaukie and Estacada. Proceed 1.6 miles, and turn right onto Highway 224 for Carver and Estacada.
    2 KB (307 words) - 18:09, 24 September 2023
  • ...nd day, the line of cars waiting to get in was continuous from Portland to Estacada. No one knows the actual attendance - figures range from 30,000 to 100,000
    4 KB (568 words) - 23:21, 25 September 2023
  • ...trails from a fish hatchery to the self-guided Bat Trail and then drops to Estacada Lake and the River Mill Dam. It will take you away from the busy day-use an ...the state park boundary. Keep to the maintenance track until you reach the Estacada Lake Boat Ramp. You can descend to the ADA deck to get an upstream view of
    9 KB (1,550 words) - 18:09, 22 September 2023
  • Drive I-205 south and take Exit 13 for Milwaukie and Estacada. Proceed 1.6 miles, and turn right onto Highway 224 for Carver and Estacada.
    2 KB (283 words) - 17:58, 24 September 2023
  • ...ion, and the dams were instrumental in the development of the community of Estacada. The two other PGE plants on the Clackamas are the North Fork Dam (1958) an ...y to power 10,000 homes. A fish ladder was added in 1912. The dam backs up Estacada Lake.
    2 KB (289 words) - 17:58, 24 September 2023
  • ...oregonhikers.org/forum/viewtopic.php?f=8&t=22924 The Molalla Highway from Estacada 11-14-15] * [https://playestacada.com/metzler-park/ Metzler Park (Play Estacada)]
    7 KB (1,155 words) - 04:18, 30 January 2024
  • Drive I-205 south and take Exit 13 for Milwaukie and Estacada. Proceed 1.6 miles, and turn right onto Highway 224 for Carver and Estacada.
    2 KB (259 words) - 22:49, 20 September 2017
  • From the east end of Estacada, at the junction with Highway 211S for Molalla and Woodburn, keep straight
    2 KB (292 words) - 17:31, 20 December 2017
  • Loop around after exiting, and turn right on Highway 224 for Damascus and Estacada. Make a right at a traffic light onto Richey Road for Estacada.
    1 KB (214 words) - 17:49, 22 September 2023
  • Drive I-205 south and take Exit 13 for Milwaukie and Estacada. Proceed 1.6 miles, and turn right onto Highway 224 for Carver and Estacada.
    2 KB (292 words) - 01:54, 26 September 2023
  • Drive Highway 212/224 east, and bear right for Carver and Estacada where Highway 212 splits off for Damascus.
    1 KB (225 words) - 22:07, 24 January 2020
  • Driving south on I-205, take Exit 13 for Highway 224, Estacada, and Milwaukie. After exiting, turn right onto Highway 224 for Estacada, and drive 2.1 miles.
    2 KB (263 words) - 17:50, 8 March 2021
  • Driving south on I-205, take Exit 13 for Highway 224, Estacada, and Milwaukie. After exiting, turn right onto Highway 224 for Estacada, and drive 2.1 miles.
    1 KB (201 words) - 17:56, 8 March 2021

View (previous 100 | next 100) (20 | 50 | 100 | 250 | 500)

Oregon Hikers Field Guide is built as a collaborative effort by its user community. While we make every effort to fact-check, information found here should be considered anecdotal. You should cross-check against other references before planning a hike. Trail routing and conditions are subject to change. Please contact us if you notice errors on this page.

Hiking is a potentially risky activity, and the entire risk for users of this field guide is assumed by the user, and in no event shall Trailkeepers of Oregon be liable for any injury or damages suffered as a result of relying on content in this field guide. All content posted on the field guide becomes the property of Trailkeepers of Oregon, and may not be used without permission.